Tianjin Xinyue Industrial and Trade Co., Ltd.
Tianjin Xinyue Industrial and Trade Co., Ltd.
Home > News

Europe Offshore Oil Platforms Projects

Dec. 26, 2018

Our company mission : To promote steel industry, To represent Made-in-China . We always keep our mission in mind and stick to it consistently in every project.


In early December 2017, Xinyue received an inquiry for 300 tons of X70 spiral steel tubes from Europe customers. The professional quotation sheet and all technical documents of Xinyue Spiral Steel Pipe Bench marking Project were submitted firstly.


One month later, the customer sent an inquiry sheet for another 800 tons of straight submerged arc steel pipe of the same project, with more than 30 specifications, each with a drawing requirement. X70 material, wall thickness up to 75 mm, ordinary T-welded pipe can not meet the technical requirements. Xinyue organized the point-to-point drawings of technical departments. The technical documents were revised six times, and the final specifications were changed from 32 to 17 accepted by customers. It took five months. In April 2018, customer orders finally arrived. The total project order was 1100 tons.


The third party supervised the whole process, issued 3.2 certificates, 1.8 meters, 2.2 meters diameter of steel pipes need all containers transportation, lasted three months and finally succeeded in delivery. The goods arrived in the hands of customers at the end of September, and the docking work has been completed for the construction phase of the project. During the construction of the project, the customer was very satisfied with the quality of the product, and the cooperation intention of the second phase of the project was more clear.


Europe Offshore Oil Platforms Projects


With the first successful cooperation, customers and Xinyue have also established a more solid and trusted cooperation relationship. In September, 2018, Greek clients won the second phase of the project last week and shared the good news with Xinyue in the first time. At present, both parties are in the final signing stage on contract details. We hope that the second phase o fproject will be delivered satisfactorily and the cooperation between the two sides will rise to a new height in the future.Xinyue steel group always strive with you!


Written by Amy


Hot Products

CONTACT US
Request a Quote